Planned operations were incorrectly shown in both the backlog and occupancy

There were some occurences of planned operations being shown twice in the Capacity Overview. If an operation was planned earlier on the same day and this scale of the graph showed the same week, it was possible for the operation to appear in the backlog and in the occupancy.