New Administration Setting Source Hierarchy


With the new administration setting 'Source Hierarchy' it is possible to set that when producing a sales order line that originates from a sales quote line with calculation, production is no longer based on the calculation as standard, but on the basis of the BOM. The setting is applied when producing from a sales order and via the Production List. The following choices are available:

  • Calculation » BOM (equal to the existing operation)
    • If a calculation is available, production will be based on the calculation by default.
    • If no calculation is available, production will be based on the BOM (if available).
  • BOM » Calculation
    • If a BOM is available, production will be based on the BOM by default.
    • If no BOM is available, production will be based on the calculation (if available).

Administration Settings

  • Production Order » General » Collect