Checkmark for Finished Must Match for All Linked Batches

 


For production sub-assemblies with at least 2 linked batches, the 'Finished' checkbox for all linked batches in the Detail must always correspond to the batch in the list. Previously this only applied to the top batch; this has now been extended to all linked batches.