Checkmark for Finished Must Match for All Linked Batches
For production sub-assemblies with at least 2 linked batches, the 'Finished' checkbox for all linked batches in the Detail must always correspond to the batch in the list. Previously this only applied to the top batch; this has now been extended to all linked batches. |
- Published:11 jan 2024 11:46
- Latest update:11 jan 2024 11:46
- TypeRelease notes
- FunctionalityVERBETERD
- Category
- Product
- Version005.076.0060.25.0
- AvailabilityOpenbaar