- MKG5
Speed up your production process with Snabbt, 90% faster calculation and work preparation! Do your calculators and work planners constantly spend a lot of time preparing and calculating projects for small, frequently changing orders? This repetitive and less challenging work takes up valuable time. Snabbt completely transforms this by automating documentation, calculation and work preparation for both simple sheet and tube parts and complex assemblies. The result? A substantial time saving at the front end of the production process.
- MKG5MKG3
Production orders can be easily created based on existing structures and data. In these situations, input remains limited or is even completely unnecessary. This guide shows how to manually enter a production order.
- MKG5
Within a production order, the responsible planner can be indicated. This is possible both at the header level and at the line level.