7
Reset filters
:
/
  • MKG5

    The standard report 'Operations of Pending Production Orders' displays the operations of pending production orders, grouped by week and year of the planned production date. For each operation, insight is provided into the expected lead times, such as setup time, processing time per piece, man-hours per machine, and total production time. The report groups data by operation and production order line, and includes totals per week and per year. This report supports the planning and capacity analysis of the production department.

  • MKG5
    MKG3

    A calculation is filled with material and operations to ensure a well-founded quote price. This article explains how to add one or more operations to a calculation. One of these operations is an outsourcing.

  • MKG5
    MKG3

    The production order pre-calculation can be manually entered. This is done by adding semi-finished products, materials, and operations for the possible different components. In this article: operations.

  • MKG5
    MKG3

    For describing the production process, operation steps can be entered from the 'Operations Management' table. A large number of properties can be set as default. Modifications within the production order are possible if desired.

  • MKG5

  • MKG5

  • MKG5