24
Reset filters
:
/
  • MKG5

    This article contains the frequently used API calls for Purchase Orders.

  • MKG5

    The standard report 'Result per Customer based on Production Order' shows the pre-calculation and actual cost amounts and times of all production orders that have been reported financially ready in the current selected fiscal year. It provides a breakdown by material, operations, and outsourcing. The report is grouped by customer.

  • MKG5

    The standard report 'PC-AC Production Orders' provides a detailed overview of production orders, including a comparison of pre-calculation and actual costs. For each order, data is displayed on items, quantities, material usage, operations, outsourcing, man-hours, and machine-hours. The report shows both pre-calculation and actual costs, including deviations per cost type. This provides insight into actual performance compared to expectations, including PC-AC factors and deviation amounts, sorted by production order and production group.

  • MKG5
    MKG3

    Sometimes it is useful to recalculate the price for a line in the sales quote, or to calculate the price for the sales order. Or to use the pre-calculation in a production order for determining the price of a sales order line. We explain how this works in this article.

  • MKG5

    The standard dashboard 'PC-AC Employee Hours' provides insight into the PC-AC ratio per employee based on the AC hours. The lower the AC relative to the PC, the better the efficiency.

  • MKG5

    This article describes the administration settings on the 'General' tab. On this tab, you will find the settings for 'Registration default based on', 'Entering hours', 'Processing hours', 'Holidays', and 'Operations'.

  • MKG5
    Smart Client

    Production locations allow production order lines and processed material to be traced during the production process. A production employee always knows where the semi-finished products and/or processed material have been placed after the previous processing.

  • MKG5

    For the benefit of production locations, the Inventory List contains a Pick-up List and a Drop List. This article provides an explanation of both lists, with a focus on the status of the production location.

  • With the new 'Production Locations' functionality, semi-finished products can be traced during the production process. A production employee always knows where the semi-finished products were placed after the previous operation.

  • MKG5

    With the standard dashboard 'PC-AC hours', it is possible to analyze how the pre- and post-calculation hours of production relate to each other based on different categories. By looking at the number of orders not linked to pre-calculations, it is also possible to check how well hours are recorded.

  • MKG5

    In the standard dashboard 'PC-AC Overview per Production Order', the preliminary and final calculation values are compared based on the selected pricing system. This provides quick insight into the result of the production order and how it is achieved.

  • Smart Client

    You begin your workday and are logged into the Shop Floor. To clock in, select the first operation by starting a new operation.

  • MKG5

    The standard dashboard 'PC-AC Analysis (Financially Ready)' displays all production orders that have been marked as financially ready and are historical. Based on this, the pre-calculation and actual costs can be compared.

  • MKG5

    This article describes the administration settings on the 'Status and actions' tab. On this tab you will find the standard configuration of the status-and-action model of the calculation.

  • MKG5

    This article describes the administration settings on the 'Shop Floor' tab. On this tab, you will find the settings for 'Clock In/Out', 'Stopping', 'Timeout', 'Special Settings', and 'Shop Floor Field Order'.

  • MKG5

    This article describes the administration settings on the 'Price structure' tab. On this tab you will find the standard settings for the price structure in MKG5, divided into 'Price structure', 'Operations', 'Items' and 'Distribution net price calculation'.

  • MKG5
    MKG3

    A calculation is filled with materials and operations to obtain a well-founded quotation price. This article explains how to add material to your calculation. You can use VRM, the accelerated calculation method.

  • MKG5
    MKG3

    The production order pre-calculation can be manually entered. This is done by adding semi-finished products, materials, and operations for the possible different components. In this article: materials.

  • MKG5
    MKG3

    Production orders can be easily created based on existing structures and data. In these situations, input remains limited or is even completely unnecessary. This guide shows how to manually enter a production order.

  • MKG5
    MKG3

    The production order pre-calculation can be manually entered. This is done by adding semi-finished products, materials, and operations for the possible different components. In this article: operations.